Lateness in production systems - In a nutshell: How to determine the causes of lateness at work systems?

Download statistics - Document (COUNTER):

Mütze, A.; Hiller, T.; Nyhuis, P.: Lateness in production systems - In a nutshell: How to determine the causes of lateness at work systems?. In: Advances in Industrial and Manufacturing Engineering 8 (2024), 100132. DOI: https://doi.org/10.1016/j.aime.2023.100132

Repository version

To cite the version in the repository, please use this identifier: https://doi.org/10.15488/17124

Selected time period:

year: 
month: 

Sum total of downloads: 5




Thumbnail
Abstract: 
Adherence to customer due dates is the yardstick for the performance of manufacturing companies. In the era of same-day delivery, consumers expect reliable delivery of ordered goods and short delivery times. Also, in the field of business-to-business supply, it is evident that adherence to delivery dates is a fundamental logistical objective for companies. Contract manufacturers, in particular, are confronted with significant challenges: strong fluctuations in customer demand, shorter requested delivery times, and high competitive pressure require appropriate organisation, planning and control of production. However, companies often miss their schedule reliability targets and fail to identify the right causes for these failures. This raises the question of what factors influence the failure to meet schedule reliability targets, how to identify such factors, and what options are available to counteract them. This contribution addresses this issue and focuses on ways to analyse the emerging lateness at work systems in production areas as a deviation of the actual form the planned throughput time. We present existing approaches to analysing the lateness behaviour at work systems and extend the current theory of logistical modelling to determine the three drivers of the so-called relative lateness – planning influences, variance of work-in-process (WIP) and sequence deviations – at work systems systematically. Through this analysis, we enable the practical applicator to initiate target-oriented countermeasures to improve the schedule reliability of their work systems with acceptable analysis expenditure.
License of this version: CC BY-NC-ND 4.0 Unported
Document Type: Article
Publishing status: publishedVersion
Issue Date: 2024
Appears in Collections:Fakultät für Maschinenbau

distribution of downloads over the selected time period:

downloads by country:

pos. country downloads
total perc.
1 image of flag of Germany Germany 2 40.00%
2 image of flag of United States United States 1 20.00%
3 image of flag of Norway Norway 1 20.00%
4 image of flag of Indonesia Indonesia 1 20.00%

Further download figures and rankings:


Hinweis

Zur Erhebung der Downloadstatistiken kommen entsprechend dem „COUNTER Code of Practice for e-Resources“ international anerkannte Regeln und Normen zur Anwendung. COUNTER ist eine internationale Non-Profit-Organisation, in der Bibliotheksverbände, Datenbankanbieter und Verlage gemeinsam an Standards zur Erhebung, Speicherung und Verarbeitung von Nutzungsdaten elektronischer Ressourcen arbeiten, welche so Objektivität und Vergleichbarkeit gewährleisten sollen. Es werden hierbei ausschließlich Zugriffe auf die entsprechenden Volltexte ausgewertet, keine Aufrufe der Website an sich.

Search the repository


Browse