Analytical model for determining the manual consolidation time for large equipment manufacturers

Zur Kurzanzeige

dc.identifier.uri http://dx.doi.org/10.15488/9659
dc.identifier.uri https://www.repo.uni-hannover.de/handle/123456789/9715
dc.contributor.author Schyga, Jakob
dc.contributor.author Braun, Philipp
dc.contributor.author Hilbrich, Svenja
dc.contributor.author Hinckeldeyn, Johannes
dc.contributor.author Kreutzfeldt, Jochen
dc.date.accessioned 2020-03-16T15:21:39Z
dc.date.issued 2020
dc.identifier.citation Schyga, Jakob; Braun, Philipp; Hilbrich, Svenja; Hinckeldeyn, Johannes; Kreutzfeldt, Jochen: Analytical model for determining the manual consolidation time for large equipment manufacturers. In: Nyhuis, P.; Herberger, D.; Hübner, M. (Eds.): Proceedings of the Conference on Production Systems and Logistics : CPSL 2020. Hannover : publish-Ing., 2020, S. 177-187. DOI: https://doi.org/10.15488/9659 ger
dc.description.abstract Large and complex products such as aircrafts or wind energy plants are usually produced in small batches. This leads to particular requirements for logistics with regard to process efficiency, flexibility and reliability as well as coordination and control of the processes. In practice, the consolidation of parts from different storage areas is a labour-intensive process, which must be considered in the planning or remodelling of warehouses. This work presents an analytical model to determine the consolidation time within a single formula at an early planning stage. Within this formula transport, handling, base and allowance times are considered. Finally, the analytical model is applied in an industrial project which deals with the new planning of warehouses for a large equipment manufacturer. The presented work connects academic approaches for calculating the commissioning time with practical experiences gained in industrial projects. Researchers benefit from this work, as practical considerations and corresponding solutions are pointed out and insights into practical projects are given, while logistics planners could benefit by applying the developed model. eng
dc.language.iso eng
dc.publisher Hannover : publish-Ing.
dc.relation.ispartof https://doi.org/10.15488/9640
dc.relation.ispartof Proceedings of the Conference on Production Systems and Logistics : CPSL 2020
dc.rights CC BY 3.0 DE
dc.rights.uri https://creativecommons.org/licenses/by/3.0/de/
dc.subject Logistics planninng eng
dc.subject Consolidation eng
dc.subject Analytical model eng
dc.subject Large equipment manufacturer eng
dc.subject.classification Konferenzschrift ger
dc.subject.ddc 620 | Ingenieurwissenschaften und Maschinenbau ger
dc.title Analytical model for determining the manual consolidation time for large equipment manufacturers
dc.type BookPart
dc.type Text
dc.description.version publishedVersion
tib.accessRights frei zug�nglich


Die Publikation erscheint in Sammlung(en):

Zur Kurzanzeige

 

Suche im Repositorium


Durchblättern

Mein Nutzer/innenkonto

Nutzungsstatistiken