Providing a Suitable Model for Solving Resource Leveling in Project Management

Zur Kurzanzeige

dc.identifier.uri http://dx.doi.org/10.15488/5031
dc.identifier.uri https://www.repo.uni-hannover.de/handle/123456789/5075
dc.contributor.author Afsari, Mahtab
dc.contributor.author Javadi Vasigh, Hesam
dc.date.accessioned 2019-06-26T12:57:10Z
dc.date.available 2019-06-26T12:57:10Z
dc.date.issued 2016
dc.identifier.citation Afsari, Mahtab; Javadi Vasigh, Hesam: Providing a Suitable Model for Solving Resource Leveling in Project Management. In: Mediterranean Journal of Social Sciences 7 (2016), 116. DOI: https://doi.org/10.5901/mjss.2016.v7n2s2p116
dc.description.abstract Resource leveling and resource Allocation are main tasks of project management. The aim of project scheduling is allocating resources to activities while faced on minimizing some economic objectives. In particular, in resource leveling problems the objective is to minimize a function of the resource utilization over time. If there is no restriction on the amount of available resources, raised the issue of resource leveling is required to fluctuations in resource utilization decreases without increasing the project duration. In this paper for managing transportation resource leveling problem, especially when based on multiple objective function of NP-hard problems, has been used Genetic Algorithm. This method is inspired from nature, presented as well as the desired resolution and optimal solutions. The results indicated that the genetic algorithm is able to respond very well at a reasonable offer. eng
dc.language.iso eng
dc.publisher Rom : Mediterranean Center of Social and Eductional Research
dc.relation.ispartofseries Mediterranean Journal of Social Sciences 7 (2016)
dc.rights CC BY 3.0 Unported
dc.rights.uri https://creativecommons.org/licenses/by/3.0/
dc.subject Business eng
dc.subject Project management eng
dc.subject Operations management eng
dc.subject Resource allocation eng
dc.subject Schedule (project management) eng
dc.subject Resource leveling eng
dc.subject Resource breakdown structure eng
dc.subject Management science eng
dc.subject Duration (project management) eng
dc.subject Genetic algorithm eng
dc.subject Resource management eng
dc.subject.ddc 300 | Sozialwissenschaften, Soziologie, Anthropologie ger
dc.title Providing a Suitable Model for Solving Resource Leveling in Project Management
dc.type Article
dc.type Text
dc.relation.essn 2039-2117
dc.relation.issn 2039-9340
dc.relation.doi https://doi.org/10.5901/mjss.2016.v7n2s2p116
dc.bibliographicCitation.volume 7
dc.bibliographicCitation.firstPage 116
dc.description.version publishedVersion
tib.accessRights frei zug�nglich


Die Publikation erscheint in Sammlung(en):

Zur Kurzanzeige

 

Suche im Repositorium


Durchblättern

Mein Nutzer/innenkonto

Nutzungsstatistiken