Cost Analysis of Implementing In-Pipe Hydro Turbine in the United Arab Emirates Water Network

Show simple item record

dc.identifier.uri http://dx.doi.org/10.15488/13629
dc.identifier.uri https://www.repo.uni-hannover.de/handle/123456789/13739
dc.contributor.author Alawadhi, Ghaya
dc.contributor.author Almehiri, Meera
dc.contributor.author Sakhrieh, Ahmad
dc.contributor.author Alshwawra, Ahmad
dc.contributor.author Al Asfar, Jamil
dc.date.accessioned 2023-05-10T12:01:36Z
dc.date.available 2023-05-10T12:01:36Z
dc.date.issued 2022
dc.identifier.citation Alawadhi, G.; Almehiri, M.; Sakhrieh, A.; Alshwawra, A.; Al Asfar, J.: Cost Analysis of Implementing In-Pipe Hydro Turbine in the United Arab Emirates Water Network. In: Sustainability 15 (2023), Nr. 1, 651. DOI: https://doi.org/10.3390/su15010651
dc.description.abstract Water transmission lines have potential reserved energy, which is usually lost. Therefore, targeting this clean energy to produce electricity to power up the auxiliaries and utilities of water plants or consumers is financially and environmentally beneficial. This paper aims to investigate the feasibility of installing an inline hydropower system in an existing transmission water pipe. It analyzes the feasibility of implementing a mini-hydropower plant in the transmission line of Liwa’s reservoir in the UAE. The maximum possible power harvested is 218.175 kW at the given water flow rate and net head. The payback period and the return on investment are analyzed based on different scenarios related to capital investment, operation, maintenance cost, and plant capacity factor. It is found that the payback period ranges between one to six years, where the return on investment can be as high as 85%. Furthermore, the expected CO2 emissions saving for this project is calculated to be between 395 and 1939 tons per year. eng
dc.language.iso eng
dc.publisher Basel : MDPI
dc.relation.ispartofseries Sustainability 15 (2023), Nr. 1
dc.rights CC BY 4.0 Unported
dc.rights.uri https://creativecommons.org/licenses/by/4.0/
dc.subject energy harvesting eng
dc.subject hydro-power eng
dc.subject in-pipe turbine eng
dc.subject renewable energy eng
dc.subject Liwa’s reservoir eng
dc.subject.ddc 333,7 | Natürliche Ressourcen, Energie und Umwelt ger
dc.subject.ddc 690 | Hausbau, Bauhandwerk ger
dc.title Cost Analysis of Implementing In-Pipe Hydro Turbine in the United Arab Emirates Water Network eng
dc.type Article
dc.type Text
dc.relation.essn 2071-1050
dc.relation.doi https://doi.org/10.3390/su15010651
dc.bibliographicCitation.issue 1
dc.bibliographicCitation.volume 15
dc.bibliographicCitation.date 2023
dc.bibliographicCitation.firstPage 651
dc.description.version publishedVersion
tib.accessRights frei zug�nglich