Case Study: Smart Maintenance Maturity Assessment as a Starting Point for Achieving Reliability and Safety in the Oil and Gas Industry

Zur Kurzanzeige

dc.identifier.uri http://dx.doi.org/10.15488/12370
dc.identifier.uri https://www.repo.uni-hannover.de/handle/123456789/12469
dc.contributor.author Schuh, Günther eng
dc.contributor.author Defer, Florian eng
dc.contributor.author Frank, Jana eng
dc.contributor.author Strack, Bernhard eng
dc.contributor.author Stich, Volker eng
dc.contributor.author Bahrami, Kourosh eng
dc.contributor.author Honné, Michael eng
dc.date.accessioned 2022-07-05T09:48:58Z
dc.date.available 2022-07-05T09:48:58Z
dc.date.issued 2022
dc.identifier.citation Schuh, G. et al.: Case Study: Smart Maintenance Maturity Assessment as a Starting Point for Achieving Reliability and Safety in the Oil and Gas Industry. In: Journal of Production Systems and Logistics 2 (2022), 11. DOI: https://doi.org/10.15488/12370 eng
dc.description.abstract Industry 4.0 and Smart Maintenance represent a great opportunity to make manufacturing and maintenance more effective, safer, and reliable. However, they also represent massive change and corresponding challenges for industrial companies, as many different options and starting points have to be weighed and the individual right paths for achieving Smart Maintenance need to be identified. In our paper, we describe our approach to evaluating maintenance organizations in a case study for the oil and gas industry, developing a shared vision for the future, and deriving economical and effective measures. We will demonstrate our approach, by showcasing a specific example from the oil and gas industry, where a need for action on HSE-relevant critical flanges in the company's piping systems was identified. We describe the steps, that were taken to identify the need for action, the specifications of the project and the criticality analysis of the piping system. This resulted in the derivation of a digitalization measure for critical flanges, which was first commercially analyzed and then the flanges were equipped with a continuous monitoring solution. Finally, a conclusion is drawn on the performed procedure and the achieved improvements. eng
dc.language.iso eng eng
dc.publisher Hannover : publish-Ing.
dc.relation.ispartofseries Journal of Production Systems and Logistics 2 (2022) eng
dc.rights CC BY 3.0 DE eng
dc.rights.uri http://creativecommons.org/licenses/by/3.0/de/ eng
dc.subject Reliability eng
dc.subject Safety eng
dc.subject Smart Maintenance eng
dc.subject Maturity Level Models eng
dc.subject Oil and Gas Industry eng
dc.subject Online Condition Monitoring eng
dc.subject.ddc 600 | Technik eng
dc.title Case Study: Smart Maintenance Maturity Assessment as a Starting Point for Achieving Reliability and Safety in the Oil and Gas Industry eng
dc.type Article eng
dc.type Text eng
dc.relation.essn 2702-2587
dc.description.version publishedVersion eng
tib.accessRights frei zug�nglich eng


Die Publikation erscheint in Sammlung(en):

Zur Kurzanzeige

 

Suche im Repositorium


Durchblättern

Mein Nutzer/innenkonto

Nutzungsstatistiken