Pareto Heuristic for Product Family-Oriented Product-Workstation Allocation Planning with Restricted Capacities

Zur Kurzanzeige

dc.identifier.uri https://www.repo.uni-hannover.de/handle/123456789/12291
dc.identifier.uri https://doi.org/10.15488/12193
dc.contributor.author Urnauer, Christian
dc.contributor.author Larem, Anna-Maria
dc.contributor.author Metternich, Joachim
dc.contributor.editor Herberger, David
dc.contributor.editor Hübner, Marco
dc.date.accessioned 2022-06-02T11:44:52Z
dc.date.issued 2022
dc.identifier.citation Urnauer, C.; Larem, A.-M.; Metternich, J.: Pareto Heuristic for Product Family-Oriented Product-Workstation Allocation Planning with Restricted Capacities. In: Herberger, D.; Hübner, M. (Eds.): Proceedings of the Conference on Production Systems and Logistics: CPSL 2022. Hannover : publish-Ing., 2022, S. 267-276. DOI: https://doi.org/10.15488/12193
dc.identifier.citation Urnauer, C.; Larem, A.-M.; Metternich, J.: Pareto Heuristic for Product Family-Oriented Product-Workstation Allocation Planning with Restricted Capacities. In: Herberger, D.; Hübner, M. (Eds.): Proceedings of the Conference on Production Systems and Logistics: CPSL 2022. Hannover : publish-Ing., 2022, S. 267-276. DOI: https://doi.org/10.15488/12193
dc.description.abstract A prerequisite for value stream design is the segmentation of products into families. This means that all products of a family are assigned to the same group of workstations so that the resulting material flows are separated as good as possible, and a higher degree of transparency is reached on the shop floor. However, since the number of workstations as well as their capacity is limited, shared resources cannot always be avoided in practice. Furthermore, the objective of product family orientation may compete with the objective of fulfilling product-workstation preferences. These preferences result, for example, from required equipment like specific tooling or from capability requirements. An optimization heuristic for this product-workstation allocation problem is presented within this article. First, the mathematical problem is formally described, then the heuristic is introduced and the required data for its application is outlined. For the evaluation, an extensive test set is generated, comparison heuristics are implemented, and solutions are made comparable through problem-specific bounds for both objectives. The results show that the solution quality of the pareto heuristic for both objective functions achieves almost the level of the comparison heuristics, which optimize only one of the objectives in isolation. eng
dc.language.iso eng
dc.publisher Hannover : publish-Ing.
dc.relation.ispartof Proceedings of the Conference on Production Systems and Logistics: CPSL 2022
dc.relation.ispartof https://doi.org/10.15488/12314
dc.rights CC BY 3.0 DE
dc.rights.uri https://creativecommons.org/licenses/by/3.0/de/
dc.subject value stream design eng
dc.subject segmentation eng
dc.subject pareto optimization eng
dc.subject Factory planning eng
dc.subject Data Analytics eng
dc.subject Mathematical optimization eng
dc.subject Konferenzschrift ger
dc.subject.ddc 620 | Ingenieurwissenschaften und Maschinenbau
dc.title Pareto Heuristic for Product Family-Oriented Product-Workstation Allocation Planning with Restricted Capacities eng
dc.type BookPart
dc.type Text
dc.relation.essn 2701-6277
dc.bibliographicCitation.firstPage 267
dc.bibliographicCitation.lastPage 276
dc.description.version publishedVersion
tib.accessRights frei zug�nglich


Die Publikation erscheint in Sammlung(en):

Zur Kurzanzeige

 

Suche im Repositorium


Durchblättern

Mein Nutzer/innenkonto

Nutzungsstatistiken