Estimation of Production Cost in an Early Design Stage of CFRP Lightweight Structures

Zur Kurzanzeige

dc.identifier.uri http://dx.doi.org/10.15488/1710
dc.identifier.uri http://www.repo.uni-hannover.de/handle/123456789/1735
dc.contributor.author Denkena, Berend
dc.contributor.author Horst, Peter
dc.contributor.author Schmidt, Carsten
dc.contributor.author Behr, Matthias
dc.contributor.author Krieglsteiner, Joscha
dc.date.accessioned 2017-07-17T07:53:17Z
dc.date.available 2017-07-17T07:53:17Z
dc.date.issued 2017
dc.identifier.citation Denkena, B.; Horst, P.; Schmidt, C.; Behr, M.; Krieglsteiner, J.: Estimation of Production Cost in an Early Design Stage of CFRP Lightweight Structures. In: Procedia CIRP 62 (2017), S. 45-50. DOI: https://doi.org/10.1016/j.procir.2016.06.031
dc.description.abstract Development of composite structure which are both light and economically competitive is challenging. A new method for the development of CRFP lightweight structures implements a frequent interaction of design and production planning starting in an early design stage. As part of this, production alternatives need to be compared in terms of cost and impact on structural mass. This paper describes how a software module automatically determines suitable process chains based on a preliminary structural design. Cost of production is estimated using analytical process models dealing with imprecise design information. Applied to an aircraft fuselage panel, the method estimates cost and mass of different production alternatives. © 2017 The Authors. Published by Elsevier B.V. eng
dc.description.sponsorship Federal State of Lower Saxony
dc.description.sponsorship European Regional Development Fund (ERDF)
dc.description.sponsorship DFG
dc.language.iso eng
dc.publisher Amsterdam : Elsevier BV
dc.relation.ispartofseries Procedia CIRP 62 (2017)
dc.rights CC BY-NC-ND 4.0 Unported
dc.rights.uri https://creativecommons.org/licenses/by-nc-nd/4.0/
dc.subject Composite eng
dc.subject Design method eng
dc.subject Development eng
dc.subject Methodology eng
dc.subject Planning eng
dc.subject Production eng
dc.subject Composite materials eng
dc.subject Cost estimating eng
dc.subject Costs eng
dc.subject Fuselages eng
dc.subject Manufacture eng
dc.subject Planning eng
dc.subject Production eng
dc.subject Production control eng
dc.subject Structural design eng
dc.subject Cost of productions eng
dc.subject Design method eng
dc.subject Development eng
dc.subject Early design stages eng
dc.subject Methodology eng
dc.subject Preliminary structural design eng
dc.subject Production alternatives eng
dc.subject Production Planning eng
dc.subject Cost benefit analysis eng
dc.subject.classification Konferenzschrift ger
dc.subject.ddc 600 | Technik ger
dc.title Estimation of Production Cost in an Early Design Stage of CFRP Lightweight Structures
dc.type Article
dc.type Text
dc.relation.issn 2212-8271
dc.relation.doi https://doi.org/10.1016/j.procir.2016.06.031
dc.bibliographicCitation.volume 62
dc.bibliographicCitation.firstPage 45
dc.bibliographicCitation.lastPage 50
dc.description.version publishedVersion
tib.accessRights frei zug�nglich


Die Publikation erscheint in Sammlung(en):

Zur Kurzanzeige

 

Suche im Repositorium


Durchblättern

Mein Nutzer/innenkonto

Nutzungsstatistiken