dc.identifier.uri |
http://dx.doi.org/10.15488/1699 |
|
dc.identifier.uri |
http://www.repo.uni-hannover.de/handle/123456789/1724 |
|
dc.contributor.author |
Denkena, Berend
|
|
dc.contributor.author |
Dittrich, Marc-André
|
|
dc.contributor.author |
Georgiadis, Alexander
|
|
dc.date.accessioned |
2017-07-17T07:35:04Z |
|
dc.date.available |
2017-07-17T07:35:04Z |
|
dc.date.issued |
2017 |
|
dc.identifier.citation |
Denkena, B.; Dittrich, M.-A.; Georgiadis, A.: Combining in-house Pooling and Sequencing for Product Regeneration by Means of Event-driven Simulation. In: Procedia CIRP 62 (2017), S. 153-158. DOI: https://doi.org/10.1016/j.procir.2016.06.005 |
|
dc.description.abstract |
The condition of complex products in the transport industry, such as train couplings or aircraft turbines, is not exactly determinable before their disassembly and diagnosis in a maintenance plant. Thus, planning and control of their regeneration is impeded since work plans and spare part demand result at short notice. This paper presents a novel method, which combines a planning approach, the in-house pooling of components, and a controlling approach, the sequencing of components, by means of event-driven simulation. Thereby, mean cycle time, mean tardiness and on-time delivery can be optimized under the consideration of the volatile conditions. © 2017 The Authors. Published by Elsevier B.V. |
eng |
dc.description.sponsorship |
German Ministry of Economics and Energy |
|
dc.language.iso |
eng |
|
dc.publisher |
Amsterdam : Elsevier BV |
|
dc.relation.ispartofseries |
Procedia CIRP 62 (2017) |
|
dc.rights |
CC BY-NC-ND 4.0 Unported |
|
dc.rights.uri |
https://creativecommons.org/licenses/by-nc-nd/4.0/ |
|
dc.subject |
Production planning and control |
eng |
dc.subject |
Sequencing |
eng |
dc.subject |
Simulation |
eng |
dc.subject |
Manufacture |
eng |
dc.subject |
Planning |
eng |
dc.subject |
Production control |
eng |
dc.subject |
Aircraft turbines |
eng |
dc.subject |
Event-driven simulations |
eng |
dc.subject |
Planning and control |
eng |
dc.subject |
Production planning and control |
eng |
dc.subject |
Sequencing |
eng |
dc.subject |
Simulation |
eng |
dc.subject |
Spare part demands |
eng |
dc.subject |
Transport industry |
eng |
dc.subject |
Aircraft manufacture |
eng |
dc.subject.classification |
Konferenzschrift |
ger |
dc.subject.ddc |
600 | Technik
|
ger |
dc.title |
Combining in-house Pooling and Sequencing for Product Regeneration by Means of Event-driven Simulation |
eng |
dc.type |
Article |
|
dc.type |
Text |
|
dc.relation.issn |
2212-8271 |
|
dc.relation.doi |
https://doi.org/10.1016/j.procir.2016.06.005 |
|
dc.bibliographicCitation.volume |
62 |
|
dc.bibliographicCitation.firstPage |
153 |
|
dc.bibliographicCitation.lastPage |
158 |
|
dc.description.version |
publishedVersion |
|
tib.accessRights |
frei zug�nglich |
|